Gantt Chart

The Gantt chart shows a project’s phases and tasks as horizontal bars on a timeline, so you can see how work overlaps and reschedule it by dragging. It is a view of Phases & Tasks on the project’s Plan tab, not a separate tab. For a standalone schedule to share with a GC, see the construction schedule template.

Switch the Plan tab to Gantt, follow the dependency arrows into closeout, and drag a bar to reschedule — an Undo prompt confirms the change.

  1. Open Phases & Tasks. Open the project and click the Plan tab.

  2. Switch to Gantt. In the tab header, click Gantt. Click List to switch back.

Only tasks with dates appear on the timeline. Set a Start Date and Duration on a task – see phases and tasks – to place it on the chart.

  • Each task is a bar; phases roll up into a summary bar above their tasks.
  • A red vertical line marks today. Click Today in the toolbar to scroll back to it.
  • Dependency arrows connect tasks that depend on one another.
  • The legend at the bottom maps bar colors to To Do, In Progress, and Done.

Use the zoom buttons to fit more or less of the schedule on screen. Three levels are available – day, week, and month – with the current level shown between the buttons. Day view shades weekends.

  1. Move a task. Drag a bar left or right to shift its start and end dates together.

  2. Change its length. Drag the right edge of a bar to extend or shorten it; this updates the end date and duration.

  3. Edit details. Hover a bar and click the pencil to open the task dialog.