Free construction templates for subcontractors

The paperwork GCs, owners and inspectors expect — pay applications, schedules of values, change orders, daily reports, lien waivers, contracts — as fillable PDFs, Excel workbooks with the formulas built in, and editable Word documents. Free, no email required.

Templates
42 templates
Files
102 downloadable files
Formats
3 formats: PDF · Excel · Word
New · Online tool Build your pay application in the browser Schedule of values, retainage and the monthly roll-forward done for you, then a filled G702/G703-style PDF. Saves in your browser, no email. Open the builder

Need quantities first? The drywall calculator and the rest of our free tools build an estimate as you go, and the material price trends show how lumber, concrete, steel and copper wire have moved before you price them.

Billing & payment

The paperwork that turns finished work into a check: pay applications, schedules of values, invoices, lien waivers.

Estimates, bids & proposals

Price the job, present it, and win it — with the math done right.

By trade

Customer-ready estimates laid out the way each trade measures and prices the work, with a takeoff calculator for that trade.

Roofing Estimate Template — preview
Free download PDF · Excel · Word

Roofing Estimate Template

Re-roof estimate by phase with a decking allowance, plus a takeoff that turns pitch and plan dimensions into squares and bundles.

Get the template
Landscaping Estimate Template — preview
Free download PDF · Excel · Word

Landscaping Estimate Template

Site prep, planting, sod, irrigation and mulch by phase, plus a takeoff for sod pallets, mulch and soil yards, and plant counts.

Get the template
Painting Estimate Template — preview
Free download PDF · Excel · Word

Painting Estimate Template

Prep, walls, ceilings and trim by phase, plus a takeoff that turns room dimensions into paintable area, gallons and labor hours.

Get the template
HVAC Estimate Template — preview
Free download PDF · Excel · Word

HVAC Estimate Template

Equipment, installation and controls by phase, plus a takeoff for duct runs, line-set length and added refrigerant charge.

Get the template
Electrical Estimate Template — preview
Free download PDF · Excel · Word

Electrical Estimate Template

Service, circuits, devices and lighting by phase, plus a device-count takeoff that turns openings into labor hours and wire footage.

Get the template
Plumbing Estimate Template — preview
Free download PDF · Excel · Word

Plumbing Estimate Template

Rough-in, fixtures and water heater by phase, plus a fixture takeoff that turns counts into rough and trim hours and pipe footage.

Get the template
Fence Estimate Template — preview
Free download PDF · Excel · Word

Fence Estimate Template

Removal, posts, panels and gates by phase, plus a takeoff for posts, rails, pickets and concrete bags per hole.

Get the template
Concrete Estimate Template — preview
Free download PDF · Excel · Word

Concrete Estimate Template

Demo, forming, reinforcement and finish by phase, plus a slab takeoff for cubic yards, base, rebar and forms.

Get the template
Drywall Estimate Template — preview
Free download PDF · Excel · Word

Drywall Estimate Template

Hang, tape, finish and texture by phase, plus a takeoff for board count by sheet size, mud, tape and corner bead.

Get the template
Flooring Estimate Template — preview
Free download PDF · Excel · Word

Flooring Estimate Template

Removal, prep, install and trim by phase, plus a takeoff for square footage with waste, boxes, underlayment and trim.

Get the template

Contracts & scope

Agreements and scope documents that keep the job — and the money — defined.

Subcontractor Agreement Template — preview
Free download Word · PDF

Subcontractor Agreement Template

15-section standard-form subcontract — scope, retainage, written change orders, lien waivers, insurance.

Get the template
Scope of Work Template — preview
Free download Word · PDF

Scope of Work Template

Define exactly what is included, excluded, assumed and owed by others before anyone signs.

Get the template
Construction Change Order Template — preview
Free download PDF · Word · Excel

Construction Change Order Template

Price the change, adjust the contract sum and schedule, and get both signatures before the work starts.

Get the template
Notice of Commencement (Florida) — preview
Free download Word · PDF

Notice of Commencement (Florida)

The recorded Florida form under § 713.13: property, owner, contractor, surety, lender, designees and the owner warning.

Get the template
Construction Contract Template — preview
Free download Word · PDF

Construction Contract Template

Owner–contractor agreement for direct work: price, payment schedule, changes, warranty and termination.

Get the template
Equipment Rental Agreement — preview
Free download Word · PDF

Equipment Rental Agreement

Bare or operated rental with an equipment schedule, hourly to monthly rates, fuel, damage, insurance and return condition.

Get the template
Certificate of Substantial Completion Template — preview
Free download Word · PDF

Certificate of Substantial Completion Template

Fix the completion date, the punch list, the warranty start and the retainage release in one signed page.

Get the template
Notice to Proceed Template — preview
Free download Word · PDF

Notice to Proceed Template

Formal start authorization with the contract time clock, conditions and acknowledgment.

Get the template
Construction Letter of Intent — preview
Free download Word · PDF

Construction Letter of Intent

Award a subcontract scope and price pending the formal subcontract, with a capped early-work authorization.

Get the template

Field & daily paperwork

Daily reports, tickets, RFIs and orders that build the record while the work happens.

Project controls & logs

Schedules, logs and trackers that keep the job on time and on budget.

Safety

The forms an inspector, a GC safety officer or an insurer will ask to see.

Built like the documents BuildWorkPro produces

Every template here is generated from the same document design our software uses for the bids, change orders, invoices, pay applications and daily reports it sends on behalf of subcontractors — the same type, the same table grammar, the same signature blocks. Each one comes with a completed example on a realistic job so you can see what a finished document looks like before you fill in your own. They are checked on real work at our founder's glazing company, and when we improve a template every format is rebuilt together.

Want the whole set?

Every template above is a free, direct download — no email needed. If you'd rather get everything at once, we'll email the download links to this address. One-time message, not a newsletter — we don't add you to a marketing list.

Questions about the templates

Are these construction templates really free?

Yes. Every template on this page is a direct download — no email, no account, no watermark. Use them on as many jobs as you like and share them with your crew or your GC. The only thing we ask is that you do not resell them as your own product.

Which file formats do the templates come in?

Every template ships as a fillable PDF you can type into in Acrobat, Preview or Chrome (or print and fill by hand). Forms that involve math — pay applications, estimates, invoices, schedules, logs — also come as Excel workbooks with the formulas built in. Contracts, agreements and letter-style forms also come as editable Word documents. Each page shows exactly which formats it offers, plus a completed example PDF.

Do the Excel and Word files work in Google Sheets and Google Docs?

Yes. Upload the .xlsx to Google Drive and open it in Sheets, or the .docx and open it in Docs — formatting, formulas and dropdowns carry over. They also open in Apple Numbers and Pages and in LibreOffice.

Are the pay application forms official AIA documents?

No. AIA, G702 and G703 are trademarks of The American Institute of Architects, and the official forms are licensed through AIA Contract Documents. Our pay application template follows the same information architecture — application summary, continuation sheet, retainage — in our own format, which is what many general contractors accept. Confirm with your GC whether they require the licensed AIA form.

Are the contract and lien waiver templates legal advice?

No. They are general-purpose starting points written for U.S. subcontractors. Contract terms, lien law and prompt-payment rules vary by state, and several states require statutory lien waiver forms. Have a construction attorney review any agreement before you rely on it.

How were these templates made?

They are generated from the same document design BuildWorkPro uses for the bids, change orders, invoices, pay applications and daily reports it produces for subcontractors, and they are checked on real jobs run by our founder’s own glazing company. Every template is rebuilt from source, so when we improve one, every format updates together.

Or stop filling out templates altogether

BuildWorkPro generates bids, pay applications, change orders, invoices and daily reports from your project data — $79/month flat, unlimited users.

Start free trial

Evaluating software? See how BuildWorkPro compares with Procore, Buildertrend and other construction software.